Canadian Bay Resort

Save $100 off Your Stay
Use Code at Checkout: LOCALA100
Select a date range to see a price
Check In
Checkout
No date selected
No date selected
Guests
Up to
12
8
+
  • Locala Verified
  • Secure Payment
  • 200+ Five-Star Reviews
Canadian Bay Resort
  • 13Reviews
  • 6Bedrooms
  • 5Bathrooms
  • 12Guests
Mount Eliza

Private Resort

Beach Access

Tennis

Pool

Spa

Sauna

Cinema Room

Save 5%
5% cheaper compared to other platforms Airbnb, Stayz
Flexible Cancellations
May - August: Full refund up to 10 days prior to check-in date | Sep - Apr: Full refund up to 21 days prior to check-in date
Linger Longer
Late check-out – if no back-to-back with another guest
Exclusive Access
Access to exclusive discount codes for restaurants and activities
About

FREE FUEL CREDIT AND LATE CHECK-OUT - ENQUIRE NOW

Escape to a private resort-style sanctuary, where days unfold between a full-size tennis court, basketball ring, solar-heated pool, gas-heated spa, sauna, cinema room and a sweeping entertaining terrace. A secluded path leads directly to the sand, creating the ultimate luxury retreat.

Gaze across breathtaking bay views at the Melbourne skyline, with iconic beaches at your doorstep and charming villages just minutes away.

The space

— a rare blend of seclusion, beauty and effortless indulgence.

  • Spectacular sunsets and breath taking views sweeping Port Phillip Bay, to the Melbourne skyline
  • Expansive indoor–outdoor living designed by renowned architect Nicholas Day
  • Championship full‑size tennis court
  • Basketball Ring
  • Solar-heated pool*
  • Gas heated spa*
  • Spa bath in Master suite with bay views
  • Sauna (comfortably fitting up to 4 people)
  • Cinema and arcade game room, equipped with large screen with free-to-air TV and streaming app access
  • Built-in wood fire pizza oven (Guests to bring their own firewood)
  • Undercover pergola with dining
  • Fully equipped kitchen with GAGGENAU appliances and state-of-the-art triple SUBZERO fridge/freezer with climate wine storage
  • Grand entry with dramatic double staircase and soaring light‑filled spaces
  • Marble gas fireplaces in key living zones
  • Smart TV in downstairs lounge
  • Ducted heating and cooling throughout the home*
  • High‑speed wireless internet
  • Full laundry with washing machine and dryer
  • Hairdryer provided
  • Portacot and highchair available

* Pool is solar heated year-round. Solar heating relies on sunlight and warm days, so during winter or cooler periods, the water may not reach a comfortable swimming temperature. It typically takes several days of consistent sunshine to heat up. The pool is generally warmest and best for swimming between late spring and early autumn (around October to April).
* Spa is heated to 35 degrees celsius at an additional charge of $50 per day.
* Ducted heating/cooling throughout entire home (except the downstairs Double bedroom - Bedroom 6).

Location

  • You have direct backyard - to beach path access to Canadian Bay Beach
  • 2 min to Ranelagh Club (private club including tennis, sailing, dining, events, bay views)
  • 3 min to Mount Eliza Village (boutique shops, cafés, restaurants)
  • 4 min to Canadian Bay Beach
  • 10 min to Mornington Golf Club
  • 12 min to Mornington Main Street (bars, restaurants, cafés)
  • 14 min to Mount Martha Village
  • 15 min to Mount Martha Golf Course
  • 18 min to Red Hill Wine Region
  • 30 min to Peninsula Hot Springs
  • 32 min to Alba Thermal Springs
  • 40 min to Hotel Sorrento
  • 45 min to Portsea Hotel

Bedding Configuration (sleeps 12)

Bedroom 1: King bed (Upstairs master suite with full bathroom, including spa bath and WIR)
Bedroom 2: King bed (Upstairs with wardrobes and balcony access)
Bedroom 3: King bed (Upstairs with wardrobes and balcony access)
Bedroom 4: King bed (Upstairs with wardrobes and balcony access)
Bedroom 5: Queen bed (Upstairs with ensuite bathroom)
Bedroom 6: Double bed (Downstairs, this room does not have heating/cooling or block out blinds, only dark sheer curtains)

Guest access

  • Guests have full access to the entire property
  • The garage is not for guest use. Plenty of parking remains in the driveway for up to 5 cars

The neighbourhood

Location

Surrounded by Mornington, Mount Martha and Frankston South.

  • You have direct backyard - to beach path access to Canadian Bay Beach
  • 2 min to Ranelagh Club (private club including tennis, sailing, dining, events, bay views)
  • 3 min to Mount Eliza Village (boutique shops, cafés, restaurants)
  • 4 min to Canadian Bay Beach
  • 10 min to Mornington Golf Club
  • 12 min to Mornington Main Street (bars, restaurants, cafés)
  • 14 min to Mount Martha Village
  • 15 min to Mount Martha Golf Course
  • 18 min to Red Hill Wine Region
  • 30 min to Peninsula Hot Springs
  • 32 min to Alba Thermal Springs
  • 40 min to Hotel Sorrento
  • 45 min to Portsea Hotel

Beaches
The Mornington Peninsula is home to some of the best beaches in Victoria. You have the iconic Canadian Bay Beach at your doorstep, and can also visit the white sands of Dromana, the lighthouse at McCrae, Gunnamatta surf beach, St Andrews, the beach boxes of Mills Beach, Mornington, the Rockpools of Blairgowrie or the cliffs of The Pillars, Mount Martha.

Restaurants/Cafes
There really is an endless array of eateries on the Mornington Peninsula. Try out Mount Eliza Village for an easy, relaxed local village vibe with Ezra Next Door, 1001 Nights, Bau Bau Dining, Ad Hoc or Mt. Terrasse. Or head down to the Ranelagh Club for a beautiful meal and view.

Supermarkets
Ritches IGA and Woolworths are just 3 minutes away at The Village.

Wine Region
You’re in the heart of the Mornington Peninsula wine region, with some of the most popular wineries in the area being just minutes away, including Dromana Estate, Trofeo Estate, Red Hill Estate, Polperro Winery, Jackalope, Montalto, Pt Leo Estate and Ten Minutes By Tractor. If you’re looking for something a little stronger, try the local distilleries like Jetty Road Brewery, JimmyRums, Johnny Ripe, Bass & Flinders and St Andrews Brewery.

Complementary services
Wireless Internet access
Complementary luxury linen and towels
Complementary bathroom toiletries and basic kitchen supplies
Consumables (toilet paper, basic kitchen and laundry cleaning supplies, coffee, tea, oil etc.)

Other things to note

  • *Free $50 fuel credit provided to guests for new bookings from April - August 2026, redeemed at time of booking
  • *Free late check-out applicable for months of April - August (for bookings where there isn't already a check-in on the same day as check-out - please check with host to confirm). Excludes check-outs falling on Fridays, Saturdays, long weekends or school holidays - enquire now!
  • This property is fitted with external cameras on the facade of the home, which is recording movements and audio into and out of the home. There are cameras that view the gate and driveway which are operational. There are also cameras that have been covered above the tennis court and pool areas so guests have complete privacy in these areas.
  • Tennis Court lights are not operational by guests
  • The property has a noise-aware alarm, which notify the owner and guest if music is unreasonably loud
  • Non-smoking property
  • No pets
  • This property follows Airbnb's strict no party and loud music policy. Guests will be evicted if they break this policy
  • Any discounts given by locala to guests cannot be redeemed for dates during "peak periods" unless otherwise specified, including the months of December and January as well as Victorian school holidays and Victorian public holidays throughout the year

This property is professionally hosted by Bec from locala. Bec manages many properties across the Peninsula and Melbourne.

Bec is a Mornington Peninsula native, passionate about sharing her knowledge and the magic that is fondly known as the ‘ninsh’.

The locala mission is to create beautiful and meaningful experiences for guests to share with friends and family that will be remembered forever. So what are you waiting for...

IG: @localastays

Please note: Due to our high standard of holiday accommodation we do not accept schoolies, bucks/hens bookings, nor do we accept parties or events due to strict council regulations. This excludes family bookings travelling with children. PENALTIES WILL APPLY TO GUESTS.

Local laws: We strictly follow laws set by the Mornington Peninsula Shire for short term stays.
1. Outdoor areas including swimming pools, spas, outdoor decking and balconies are not to be used between 11.00pm to 7.00am.
2. Disturbances to neighbours including parties, loud music and yelling, heard at anytime, might lead to eviction and forfeiture of your bond.

For non-Airbnb bookings, we charge a $2000 bond which will be held and released 3-5 business days after checkout, subject to no identifiable loss or damage.

Amenities
Air conditioning
Baking sheet
Bathtub
Beach
Beach Front
Beach View
Beach access
Bed linens
Body soap
Cable TV
City View
Cleaning Disinfection
Cleaning products
Clothing storage
Coffee
Coffee maker
Conditioner
Cookware
Cycling
Dining table
Dishes and silverware
Dishwasher
Dryer
Essentials
Extra pillows and blankets
Family/kid friendly
Fire extinguisher
Fishing
Free parking on premises
Free parking on street
Freezer
Game room
Garden View
Garden or backyard
Golf - Optional
Hair dryer
Hangers
Heating
High chair
High touch surfaces disinfected
Horseback Riding
Hot water
Indoor fireplace
Internet
Iron
Kettle
Kitchen
Laundromat nearby
Long term stays allowed
Luggage dropoff allowed
Microwave
Mountain Climbing
Mountain view
Near Ocean
Ocean Front
Outdoor pool
Outdoor seating (furniture)
Oven
Pack ’n Play/travel crib
Patio or balcony
Private entrance
Private pool
Refrigerator
Rice maker
Room-darkening shades
Sauna
Sea view
Shampoo
Shopping
Shower gel
Smoke detector
Spa
Stove
Swimming pool
TV
Toaster
Towels provided
Town
Village
Washer
Water Sports
Water View
Waterfront
Wine glasses
Wireless Internet
Staying in Mount Eliza
MAP
Contact
Details
Cancellation policy
Flexible cancellation policy. Please see Terms for details.
House rules
Check-in: 3:00 pm Checkout before 10:00 am

If you need an early check-in or late check-out, please enquire prior to booking.
Safety & Property
Smoke alarms
External security camera
Noise decibel monitor